F1 Locate the Layer That Should Handle a Change

On this page

The Key Question Is Where a Change Belongs

A new product may require route and material records. A previously unsupported scheduling structure may require model adaptation. Both are business changes, but the engineering work differs. Layering gives each change a place and makes review scope easier to define.

Four Parts of DecisioWorks

Part Responsibility Typical changes
DataSets and the standard interface Scenario data and manufacturing relationships Orders, routes, capacity and bills of materials (BOMs)
DecisioCore Data, objectives, rules, orchestration, analysis and linkage Preferences, industry logic and feedback
GOCK Modeling and optimization Model or solving capability upgrades
Web and other applications Presentation, operation and interaction Reports, training pages and workflows

Within DecisioCore, data integration, objective management (objective_system), rule control (marginal_control), engine adaptation (engine_adapters), result analysis (analysis) and planning coordination (planning_system) have distinct roles. Its available reference implementation lets developers understand and reuse those connections or implement their own calling layer.

Map One Change

Suppose a customer wants a display grouped by color and a stronger preference for fewer color changes. These are separate requests. Grouping belongs in the application. The preference requires a color mapping and a supported changeover measure before adjusting the objective. Sorting a table does not change the solver's sequence.

Change First check Recheck after the change
Processing-time update Units and process adaptation Load, delivery and results
Delivery preference Objective measure and direction Trade-offs, details and audit
Temporary resource allowance Affected object and how the model applies the rule Enforcement and expiry
New result display Analysis fields and units Numerical consistency and readability
New model capability Input/output adaptation Support, status and existing calls

Independent Evolution Still Needs Compatibility Checks

Interfaces let modules improve separately. After adding fields, changing units or replacing a model, check input meanings, output structure and existing cases to confirm that the parts still work together. Evolution means adapting on the foundation while preserving the parts that continue to work.

The reference implementation helps partners see what can be reused and what needs adaptation. An application can use its own interface, integration or workflow while invoking optimization through defined connections.

Exercise and Review

Locate four changes: a new product, a delivery preference, an approval page and a new model capability. Identify one cross-layer effect for each.

An approval page belongs to the application, but if approval determines task release it must connect to planning inputs. Record the primary owner and affected interfaces. Layering provides responsibilities, not complete independence from consequences.

Further Reading

Design Principles and Differentiation · Architecture Overview · Production Decision Data Assets · Ecosystem Overview · Partner Onboarding and Integration

Worksheets: Worksheet: Scenario and Decision Task · Worksheet: Review and Change Record

Topic F · Previous: Define the Scope of a Disruption Response · Next: Preserve Experience in Data Assets and Industry Templates