DecisioWorks

ADOPTION · ECOSYSTEM PARTNERS

Connect production decisions to your existing business

Begin with a clear data mapping, then bring plan generation, review and feedback into daily operations. Manufacturers retain business judgment, partners contribute domain and integration expertise, and DecisioWorks supplies shared decision capabilities.

Working together · For manufacturers, consultants, industrial software vendors and integrators

How do existing systems work with the toolkit?

From source data to business handoff
StageWork involvedHandoff
ERP / MES / files and shop-floor dataConfirm sources, owners, units, time and object identifiersField inventory and sample data
Standardized data interfaceMap orders, routes and resources; validate relationshipsComputable dataset and diagnostic records
DecisioCore + GOCKOrganize objectives, rules and execution; generate and analyze plansConfiguration, run status, result tables and explanations
Business application and human reviewCheck commitments, resources and execution arrangementsDecision to approve, adjust or retain
Execution feedbackReceive actual deviations and decide the next actionEvidence for updating data, rules or plans

Without ERP or MES, you can begin with spreadsheets and files. With those systems in place, completeness of business meaning and relationships remains the central question. Reuse the mapping and workflow in ongoing operation, then extend them to further scenarios.

Who does what?

Agree responsibilities at the start
RoleMain contributionAssets to retain
ManufacturerBusiness objectives, operating rules, data ownership and plan approvalShared definitions, baseline and acceptance criteria
Consultant or industrial parkProblem diagnosis, scenario selection, data preparation and result communicationDiagnosis, priority scenarios and improvement path
Software partner, integrator or internal development teamData connections, workflow integration, interfaces, deployment and operationsMappings, integration code, industry application and operating instructions
DecisioWorksShared data structures, decision orchestration, optimization and analysis interfacesToolkit, open reference implementation, examples and documentation

DecisioCore can serve as an implementation reference: reuse code, extend domain logic or write your own code to call GOCK. Connecting the parts responsible for business, models and applications gives future changes a clear place to be handled.

What does each stage produce?

Six-stage route: define scenario, prepare data, run baseline, adjust and re-run, business review, integrate and operate
The adoption path continues into integration and ongoing operation. Validation is one step along the way. Open full-size image ↗
Six stages and their outputs
StageKey activityOutput
1. Define the scenarioAgree scope, horizon, owner and business questionScenario description and success criteria
2. Prepare dataCheck fields, units and object relationshipsMappings and gap list
3. Run a baselineRecord current configuration and resultsReviewable baseline
4. Adjust and re-runCompare objective, rule or resource changesConfiguration differences and result comparison
5. Business reviewCheck operational conditions, benefits and trade-offsEvidence to continue, adjust or stop
6. Integrate and operateConnect systems, define approvals and collect feedbackOperating workflow, responsibilities and maintenance arrangements

Where does value start to accumulate?

  • Data assets: shared definitions for orders, routes and resources, with reusable mappings and checks.
  • Decision evidence: turn verbal trade-off discussions into comparable configurations and results.
  • Industry assets: partners build their own rules, workflows, applications and examples on shared capabilities.
  • Ongoing operation: update the relevant data and rules as the business changes, retaining versions and feedback to improve planning over time.

Evaluate ROI against a consistently defined business baseline, such as planning effort, manual adjustments, delivery deviations and changeover losses. Include data preparation, integration and maintenance costs. Actual value depends on the scenario, data and execution conditions.

Bring five things to an initial discussion

  • A recurring planning problem: the affected objects, time horizon and people.
  • An anonymized data sample: fields, units, identifiers and missing values.
  • A few key rules: what must be respected and what can be negotiated.
  • An existing plan and its deviations: how you judge a good result.
  • The people involved: who provides data, reviews results, integrates and operates the system.